Skip to main content

Daylesford Off-Grid Sigenergy EV Upgrade

An old Selectronic and lead-acid setup near Daylesford replaced with a Sigenergy upgrade — 13kW of Jinko panels, 8kW inverter, and 16kWh lithium batteries. Plus a 12kW DC car charger, with the owner planning to use their EV as a backup battery on tough winter days.

Updated 3 November 2026

Daylesford Off-Grid Sigenergy EV Upgrade
Solar System • Project Snapshot
Location near Daylesford, Victoria
Installed May 3, 2026

Daylesford Off-Grid System Upgraded to Sigenergy with 13kW Jinko Panels and DC Car Charger

Solar
13 kW
Inverter
8 kW
Battery
16 kWh
13kW Jinko solar array — Increases solar generation for higher household demand.
Sigenergy 8kW inverter — Modern hybrid inverter integrated with the existing off-grid system.
16kWh lithium battery — Replaces ageing lead-acid storage with modern lithium technology.
12kW DC EV charger — Allows fast charging directly from the off-grid solar system.
Sigenergy Gateway integration — Existing and new systems share household loads without replacing the entire installation.
Retained Selectronic and Fronius equipment — Preserves working infrastructure while modernising the system.

Summary

Daylesford off-grid upgrade: 8kW Sigenergy inverter, 13kW Jinko 510W panels, 16kWh lithium added alongside the existing Selectronic/Fronius/lead-acid system. Integrated via Sigenergy gateway so old and new share loads. Includes 12kW DC EV charger.

Off-Grid Solar Installation • Project Details

Upgrading an Older Off-Grid System

This property near Daylesford already had a working off-grid system built around a Selectronic inverter, Fronius AC-coupled solar, and lead-acid batteries. While the system had served the owners well, ageing battery technology and changing energy requirements made it the right time for an upgrade.

The owners also wanted to add electric vehicle charging while keeping as much of the existing infrastructure as practical.

Integrating New Solar Technology with Existing Selectronic/Fronius system

Rather than replacing the entire system, we integrated a new Sigenergy 8kW inverter, 13kW of Jinko 510W solar panels, and 16kWh of lithium battery storage alongside the existing equipment.

The key component was the Sigenergy Gateway, which allows the new and existing systems to communicate and share household loads. That meant the proven Selectronic and Fronius equipment could continue operating while gaining the benefits of modern lithium storage and higher solar production.

A 12kW DC EV charger was also included, allowing the owners to charge their electric vehicle directly from the off-grid system.

More Solar, Lithium Storage and EV Charging Without a Full Replacement

The upgrade replaces ageing lead-acid batteries with lithium storage while increasing the property’s solar generation and adding EV charging capability.

The owners are also planning to use their electric vehicle for vehicle-to-home backup in the future, giving the property another source of stored energy during extended periods of poor weather. By integrating the existing equipment rather than replacing it, the upgrade delivers more capability while making the most of infrastructure already in place.

10+ Years - 100% Off Grid - Installs Across Victoria

Get an Off Grid System Like This?

Tell us what the site is and what it runs. We'll recommend the right kind of system.

Google
Available Across Victoria
Local Ballarat Team
Sigenergy all-in-one battery unit with EV charging cable mounted on exterior wall at Daylesford off-grid upgrade
Fred from 100UP in a hard hat on a rooftop solar install

Fred works with every client, designs, manages the install onsite and supports 100UP customer systems.